Sample Record

DIME Sample ID 2022-10-26-25

Project Information

Project IdentifiersProject ID: 993316
DEA: 07325304
EFIS: 0716000083
DIST-CO-RTE-PM07-LA-118-R1.5/R10.2
Award Date12/27/2021
Closeout Date09/24/2024
Work DescriptionCONSTRUCT STORM WATER TREATMENT DEVICES AND IMPORTED BORROW.
Location DescriptionLOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM 0.3 MILE WEST OF ROUTE 118/27 SEPARATION TO 0.2 MILE EAST OF SEPULVEDA BOULEVARD UNDERCROSSING
QA Service Level1 (Verified on 11/30/2021)

Owner Lab

  • CT D07 - Plant Services, Unit 1841

Sample Information

Sample Taken Date10/26/2022 Sample Unique Key25
Date that the sample was received by the laboratory/organization performing the testing10/27/2022 Sample typeDepartment Acceptance
A brief description of the sampleReclaimed Asphalt Pavement The quantity of what the sample constitutes180 Tons
From where was the sample collectedManufacturer First name of sampler or witnessed byHonesto
Last name of sampler or witnessed byCastillo Title of samplerMREAS
Telephone number of sampler12134537563 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameAll American Asphalt-Irwindale
Transportation Laboratory (TL) NumberC006622 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceHot Plant Stockpile
Aggregate Size Aggregate Source
RAP Stockpile Stockpile Size (tons)
Reclaimed Asphalt Pavement Mix Number

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2022-10-26-25-1AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)R. Jarquin, CT D07 - Plant Services, Unit 184111/05/202211/16/2022
Yes
11/17/2022Public - Test Data Visible
2022-10-26-25-2AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)R. Jarquin, CT D07 - Plant Services, Unit 184111/05/202211/16/2022
Yes
11/17/2022Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-10-26-25-1 AASHTO T30-19 (Verified)
DIME Test ID: 2022-10-26-25-2 AASHTO T308-10 (Verified)