Sample Record
DIME Sample ID 2022-09-29-1
Sample is locked from editing. info
Project Information
| Project Identifiers | Project ID: 212720 DEA: 07291404 EFIS: 0712000094 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-1-55-58 |
| Award Date | 02/18/2021 |
| Closeout Date | 04/23/2026 |
| Work Description | TRANCAS CREEK BRIDGE REPLACEMENT |
| Location Description | IN LOS ANGELES IN CITY OF MALIBU AT TRANCAS CREEK BRIDGE (53-0027). |
| QA Service Level | 1 (Verified on 04/02/2021) |
Owner Lab
- CT - Unassigned/General Field Laboratory
Sample Information
| Sample Taken Date | 09/29/2022 | Sample Unique Key | 1 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 10/17/2022 | Sample type | Quality Assurance |
| A brief description of the sample | #9 HRC Coupler | The quantity of what the sample constitutes | 168 ea. |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Mike |
| Last name of sampler or witnessed by | Foerder | Title of sampler | QA Inspector |
| Telephone number of sampler | (707) 685-0968 | Laboratory sample identification | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | HRC | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | B285-070-22 | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | Solid Steel |
| Coupler Manufacturer | Gerdau | Intermediate Assembler or Fabricator | |
| Rebar Size | #9 | Coupler Model | 500/510 |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | 79001741 / 79001079 | Rebar Heat Number(s) | 6031181, 3114405, 4119685, 3114410 |
| Rebar Size 2 | 9 | Coupler Unique ID | Not on AML |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2022-09-29-1-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-09-29-1-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-09-29-1-3 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-09-29-1-4 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-09-29-1-5 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-09-29-1-6 CTM 670-December 2013 (Verified)
