Sample Record

DIME Sample ID 2022-09-09-45

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 215188
DEA: 080F5434
EFIS: 0817000239
Permit Numbers: 0823NMC0369
DIST-CO-RTE-PM08-RIV-I-15,SR-91-6.1-7.6
Award Date03/11/2020
Closeout Date06/05/2024
Work DescriptionI-15 ELC: 15/91 Express Lanes Connector Project (ELC)
Location DescriptionJunction of I-15 and SR-91 in Corona, CA
QA Service Level1 (Verified on 09/16/2020)

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

Sample Information

Sample Taken Date09/09/2022 Sample Unique Key45
Date that the sample was received by the laboratory/organization performing the testing09/12/2022 Sample typeQuality Assurance
A brief description of the sample#11 HRC 500/510 Couplers The quantity of what the sample constitutes150 Couplers
From where was the sample collectedJob Site First name of sampler or witnessed byEric
Last name of sampler or witnessed byDiaz Title of samplerQva inspector
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCMC
Transportation Laboratory (TL) NumberC2108-N Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC
Coupler ManufacturerHRC Intermediate Assembler or Fabricator
Rebar Size#11 Coupler ModelHRC 500/510
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)79001079, 74124730 Rebar Heat Number(s)3117030
Rebar Size 2 Coupler Unique IDTP-17-03

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2022-09-09-45-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory09/15/202209/15/2022
Yes
09/15/2022Ok NeckingPublic - Test Data Visible
2022-09-09-45-4CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory09/15/202209/15/2022
Yes
09/15/2022Ok NeckingPublic - Test Data Visible
2022-09-09-45-5CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory09/15/202209/15/2022
Yes
09/15/2022Ok NeckingPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-09-09-45-3 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-09-09-45-4 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-09-09-45-5 CTM 670-December 2013 (Verified)