Sample Record

Owner Lab

  • Atkinson Construction

DIME Sample ID 2022-02-24-32

Project Information

Project IdentifiersProject ID: 214951
DEA: 120K0234
EFIS: 1214000100
DIST-CO-RTE-PM12-ORA-5-17.1/18.9
Award Date09/23/2020
Closeout DateNot set
Work DescriptionSouth County Improvement Project (Phase 3 - El Toro/Alicia) WIDEN FREEWAY AND BRIDGES, RECONSTRUCT BRIDGE AND WALLS.
Location DescriptionORANGE COUNTY IN MISSION VIEJO, LAGUNA HILLS, LAGUNA WOODS AND LAKE FOREST FROM 0.4 MILE SOUTH OF ALICIA PARKWAY OVERCROSSING TO 0.2 MILE NORTH OF EL TORO ROAD UNDERCROSSING
QA Service Level1 (Verified on 10/01/2020)

Sample Information

Sample Taken Date02/24/2022 Sample Unique Key32
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing02/25/2022
Sample typeQuality Control A brief description of the sampleJPCP Field Qualification
The quantity of what the sample constitutes65 From where was the sample collectedJob Site
First name of sampler or witnessed byBrandon Last name of sampler or witnessed bySchroeder
Title of sampler Telephone number of sampler
Laboratory sample identificationW01-22-04040-C1 Linked DIME Sample ID
The fabricator/manufacturer/facility nameTwining Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design number3F5FL001
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected108157490
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedI-5 SB Alicia Parkway Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2022-02-24-32-1AASHTO T336-15: Standard Method of Test for Coefficient of Thermal Expansion of Hydraulic Cement ConcreteMark Torres, Atkinson Construction03/31/2022Mark Torres
Yes
08/24/2022

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-02-24-32-1 AASHTO T336-15 (Verified)