Sample Record
Owner Lab
- CT HQ - Sacramento Asphalt Binder Laboratory
DIME Sample ID 2022-07-29-17
Project Information
| Project Identifiers | Project ID: 213411 DEA: 030H10U4 EFIS: 0317000246 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC-5-9.7/24.9 |
| Award Date | 05/01/2019 |
| Closeout Date | 02/22/2024 |
| Work Description | Not set |
| Location Description | Construction on state highway in Sacramento County in and near Sacramento from 1.1 miles south of Elk Grove Boulevard to American River Viaduct |
| QA Service Level | 1 (Verified on 07/19/2019) |
Sample Information
| Sample Taken Date | 07/29/2022 | Sample Unique Key | 17 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/01/2022 | Sample type | Department Acceptance |
| A brief description of the sample | ss1h | The quantity of what the sample constitutes | 1 Oil Jug |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Jacob |
| Last name of sampler or witnessed by | Gregory | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Pacific Northwest Oil | |
| Transportation Laboratory (TL) Number | 2022-07-29-15 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphaltic Emulsion | Emulsion Grade | SS-1h |
|---|---|---|---|
| Lot Number | Not set | Sub Lot | Not set |
| Dilution Percentage Rate | Not set |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2022-07-29-17-1 AASHTO T59-16 (Verified)
