Sample Record

DIME Sample ID 2022-07-29-6

Project Information

Project IdentifiersProject ID: 212896
DEA: 04160304
EFIS: 0400000429
DIST-CO-RTE-PM04-ALA-84-13.1/13.5
Award Date11/17/2020
Closeout Date02/02/2026
Work DescriptionNILES CANYON ALAMEDA CREEK BRIDGE REPLACEMENT
Location DescriptionIN FREMONT, AT ALAMEDA CREEK BRIDGE (BR 33-0036).
QA Service Level1 (Verified on 09/16/2019)

Owner Lab

  • CT HQ - QASI Los Angeles Field Office

Sample Information

Sample Taken Date07/29/2022 Sample Unique Key6
Date that the sample was received by the laboratory/organization performing the testingNot set Sample typeQuality Control
A brief description of the sample#8 HRC 120 T-heads The quantity of what the sample constitutes172
From where was the sample collectedManufacturer First name of sampler or witnessed bySteve
Last name of sampler or witnessed byHall Title of samplerCT METS QA INSPECTOR
Telephone number of sampler6466327821 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameHeaded Reinforcement Corp, Fountain Valley, CA
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) FormL134-031-22
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Headed Bars Production or Authorization TestingProduction Testing
Rebar Heat Number(s)6030477 Head Manufacturer Lot Number(s)1, 2, 3
Rebar Size#8 Headed Bar Model NameHRC120
Size of HeadFull Size - 9x Head Connection Type
Head ShapeSquare Rebar ManufacturerCMC Fontana
Head ManufacturerHRC Fountain Valley Head FabricatorHRC Fountain Valley
Material Standard CodeASTM A706 Headed Bar Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments