Sample Record

DIME Sample ID 2022-05-19-51

Project Information

Project IdentifiersProject ID: 215129
DEA: 050N73U4
EFIS: 0520000166
DIST-CO-RTE-PM05-SB-101-7.3/9.6
Award Date10/22/2020
Closeout Date12/11/2023
Work Description!!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar,
Location DescriptionSUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE
QA Service Level1 (Verified on 08/24/2020)

Owner Lab

  • TRC Companies

Sample Information

Sample Taken Date05/19/2022 Sample Unique Key51
Date that the sample was received by the laboratory/organization performing the testing05/19/2022 Sample typeQuality Assurance
A brief description of the samplePSU 3/4" Hma The quantity of what the sample constitutes270 tons
From where was the sample collectedSupplier First name of sampler or witnessed byDarren
Last name of sampler or witnessed byLaChaine Title of samplerTester
Telephone number of sampler8056213616 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameGranite Gardner
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number1
Sublot number1 HMA Mix NumberNot set
Binder content (%)Not set Virgin binder PGNot set
Design binder PGNot set Binder SupplierNot set
RAP content (%)Not set WMA AdditivesNot set
Antistrip typeNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments