Sample Record
Owner Lab
- CT D07 - Plant Services
DIME Sample ID 2022-03-31-28
Project Information
| Project Identifiers | Project ID: 215108 DEA: 07337604 EFIS: 0717000036 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-14-R28.9/R29.2 |
| Award Date | 10/15/2020 |
| Closeout Date | 05/04/2023 |
| Work Description | REPLACE EXISTING STORM DRAIN, AND CONSTRUCT A COLLECTION SYSTEM. |
| Location Description | LOS ANGELES COUNTY IN AND NEAR SANTA CLARITA FROM 0.8 MILE NORTH OF PLACERITA CANYON ROAD UNDERCROSSING TO 0.5 MILE SOUTH OF GOLDEN VALLEY ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 02/24/2021) |
Sample Information
| Sample Taken Date | 03/31/2022 | Sample Unique Key | 28 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 03/31/2022 |
| Sample type | Quality Assurance | A brief description of the sample | 3/4 AC Aggregate |
| The quantity of what the sample constitutes | 400 tons | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Honesto | Last name of sampler or witnessed by | Castillo |
| Title of sampler | MREAS | Telephone number of sampler | 12134537563 |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | All American Asphalt-Irwindale | Transportation Laboratory (TL) Number | C-006565 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0005 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | 3/4 HMA Type A | The fabricator/manufacturer designation for the sample | 105793 |
| The plant number | Irwindale | A detailed description of where the material sample was collected | Cold Feed |
| Where the material sample would have been placed if not sampled | NB Route 14 | Primary Aggregate Nominal Size | 3/4 inch |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number | Not set |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2022-03-31-28-1 AASHTO T176-08 (Verified)
