Sample Record
DIME Sample ID 2015-02-05-1
Project Information
| Project Identifiers | Project ID: 7547 DEA: 103A1004 EFIS: 1000000409 |
|---|---|
| DIST-CO-RTE-PM | 10-SJ-4,99-R19.5/R20.1,15.0/18.6 |
| Award Date | 10/16/2012 |
| Closeout Date | 09/21/2018 |
| Work Description | WIDEN FREEWAY, CONSTRUCT BRIDGES, PUMP PLANTS AND INTERCHANGES. |
| Location Description | SAN JOAQUIN COUNTY IN AND NEAR STOCKTON ON ROUTE 4 FROM ADELBERT AVENUE TO 0.1 MILE WEST OF GOLDEN GATE AVENUE OVERCROSSING AND ON ROUTE 99 FROM 0.4 MILE NORTH OF ARCH ROAD UNDERCROSSING TO 0.1 MILE SOUTH OF ROUTE 4 WEST/99 NORTH CONNECTOR OVERCROSSING |
| QA Service Level | 1 (Verified on 12/10/2012) |
Owner Lab
- CT HQ - Sacramento Materials Management Branch Field Office
Sample Information
| Sample Taken Date | 02/05/2015 | Sample Unique Key | 1 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 04/20/2022 | Sample type | Verification |
| A brief description of the sample | concrete cylinders | The quantity of what the sample constitutes | 4 cylinders |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Brett |
| Last name of sampler or witnessed by | soldanno | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | tester | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 1111121 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | s5yrgt | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | column 1 | Where the material sample would have been placed if not sampled | Not set |
| From Lot No. | Not set | Bag Lot No. | Not set |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| 2015-02-05-1-3 | ASTM C143-10a: Standard Test Method for Slump of Hydraulic-Cement Concrete | Yang Zhu, CT HQ - Sacramento Materials Management Branch Field Office | 03/03/2015 | No |
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2015-02-05-1-3 ASTM C143-10a
