Sample Record
Owner Lab
- Sequoia Consultants
DIME Sample ID 2022-02-18-24
Project Information
| Project Identifiers | Project ID: 215129 DEA: 050N73U4 EFIS: 0520000166 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-101-7.3/9.6 |
| Award Date | 10/22/2020 |
| Closeout Date | 12/11/2023 |
| Work Description | !!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar, |
| Location Description | SUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE |
| QA Service Level | 1 (Verified on 08/24/2020) |
Sample Information
| Sample Taken Date | 02/18/2022 | Sample Unique Key | 24 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/19/2022 |
| Sample type | Quality Control | A brief description of the sample | 6x12 concrete cylinders |
| The quantity of what the sample constitutes | 1 per 100 cy | From where was the sample collected | Source |
| First name of sampler or witnessed by | Tim | Last name of sampler or witnessed by | Reyes |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Martin Marrieta Goleta | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | RW 109 | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 63511N0P |
|---|---|---|---|
| The truck number from where the sample was collected | 659 | The batch plant ticket number from where the sample was collected | 551959 |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | CHUTE FROM TRUCK | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2022-02-18-24-1 CTM 521-June 2020 (Verified)
