Sample Record

DIME Sample ID 2022-02-04-29

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 209820
DEA: 04297634
EFIS: 0415000040
COOP: 042548
DIST-CO-RTE-PM04-ALA-84,680-17.9/21
Award Date02/19/2021
Closeout DateNot set
Work DescriptionROUTE 84 WIDENING (4-LANE EXPRESSWAY) FROM I-680 TO PIGEON PASS, INCLUDING INTERSECTION, DRAINAGE IMPROVEMENTS AND UTILITY RELOCATION.
Location DescriptionALAMEDA COUNTY IN AND NEAR SUNOL, PLEASANTON, AND LIVERMORE ON ROUTE 84 FROM 0.1 MILE EAST OF ROUTE 680 TO 0.1 MILE SOUTH OF RUBY HILL DRIVE AND ON ROUTE 680 FROM 1.2 MILES SOUTH TO 1.8 MILES NORTH OF ROUTE 84
QA Service Level1 (Verified on 11/04/2019)

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

Sample Information

Sample Taken Date02/04/2022 Sample Unique Key29
Date that the sample was received by the laboratory/organization performing the testing03/08/2022 Sample typeQuality Assurance
A brief description of the sample#10 HRC 500/510 Couplers The quantity of what the sample constitutes150 Couplers
From where was the sample collectedJob Site First name of sampler or witnessed byRamon
Last name of sampler or witnessed byJuarez Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCamblin Steel
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC, Nucor
Coupler ManufacturerHRC Intermediate Assembler or Fabricator
Rebar Size#10 Coupler ModelHRC 500/510
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)73120296, 74123596 Rebar Heat Number(s)9002038, 3500019391
Rebar Size 2 Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2022-02-04-29-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)spaine, CT HQ - Sacramento Structural Materials Testing Laboratory03/14/202203/14/2022
Yes
03/14/2022ok neckingPublic - Test Data Visible
2022-02-04-29-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)spaine, CT HQ - Sacramento Structural Materials Testing Laboratory03/14/202203/14/2022
Yes
03/14/2022ok neckingPublic - Test Data Visible
2022-02-04-29-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)spaine, CT HQ - Sacramento Structural Materials Testing Laboratory03/14/202203/14/2022
Yes
03/14/2022ok neckingPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-02-04-29-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-02-04-29-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-02-04-29-3 CTM 670-December 2013 (Verified)