Sample Record

Owner Lab

  • Kleinfelder, Incorporated - Los Angeles

DIME Sample ID 2022-02-03-11

Project Information

Project IdentifiersProject ID: 214573
DEA: 073096U4
EFIS: 0719000091
DIST-CO-RTE-PM07-LA-210-R0.0/R9.7
Award Date04/03/2020
Closeout Date06/06/2024
Work DescriptionPLACE CONCRETE PAVEMENT, BARRIER, HMA, DRAINAGE, AND ELECTRICAL.
Location DescriptionLOS ANGELES COUNTY IN LOS ANGELES FROM INTERSTATE 5 TO WHEATLAND AVENUE UNDERCROSSING
QA Service Level1 (Verified on 06/05/2020)

Sample Information

Sample Taken Date02/03/2022 Sample Unique Key11
Date that the sample was received by the laboratory/organization performing the testing02/04/2022 Sample typeQuality Assurance
A brief description of the sampleA set of 4 JPCP concrete beam test specimens The quantity of what the sample constitutes906 CY
From where was the sample collectedJob Site First name of sampler or witnessed byAli
Last name of sampler or witnessed byRehman Title of samplerField Materials Tester
Telephone number of sampler7148753445 Laboratory sample identification22-0193
Linked DIME Sample ID The fabricator/manufacturer/facility nameFlatiron Plant
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberJPCP-3215-06
The truck number from where the sample was collectedLoad 18 The batch plant ticket number from where the sample was collected18
Concrete batch plantFlatiron Plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedConcrete from wheelbarrow Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2022-02-03-11-1CTM 523-May 2020: Method of Test for Flexural Strength of ConcreteEdmond Jabbour, Kleinfelder, Incorporated - Los Angeles03/03/2022
Yes
03/04/2022210 EB Stage 3: Paxton Street Approach and Departure: Station 309+51 to 317+33; 319+79 to 326+53Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-02-03-11-1 CTM 523-May 2020 (Verified)