Sample Record

DIME Sample ID 2022-01-25-1

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 215220
DEA: 07210624
EFIS: 0719000068
DIST-CO-RTE-PM07-LA,SBD-71-1.8/R4.7&R0.0/R0.2
Award Date02/05/2021
Closeout DateNot set
Work DescriptionPLACE STRUCTURE CONCRETE RETAINING WALLS & BOX CULVERT AND PLACE JPCP.
Location DescriptionIN LOS ANGELES AND SAN BERNARDINO COUNTIES IN POMONA AND CHINO HILLS FROM 0.2 MILE SOUTH OF MISSION BOULEVARD OVERCROSSING TO 0.2 MILE OF SAN BERNARDINO COUNTY LINE.
QA Service Level1 (Verified on 03/24/2021)

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

Sample Information

Sample Taken Date01/25/2022 Sample Unique Key1
Date that the sample was received by the laboratory/organization performing the testing02/01/2022 Sample typeQuality Control
A brief description of the sample#8 Grip Twist Positional Couplers The quantity of what the sample constitutes4
From where was the sample collectedManufacturer First name of sampler or witnessed byLorenzo
Last name of sampler or witnessed byGarcia Title of samplerQA
Telephone number of sampler17029172503 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameNext Century Rebar
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) FormL115-010-22
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerVinton Steel
Coupler ManufacturerBar Splice Products Intermediate Assembler or FabricatorNext Century Rebar
Rebar Size#8 Coupler ModelGrip Twist Positional
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop FabricatorNone
Coupler Component Heat/Lot Number(s)A202389, 122016, A211640 Rebar Heat Number(s)2122739
Rebar Size 2 Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2022-01-25-1-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory02/02/202202/02/2022
Yes
02/04/2022Ok NeckingPublic - Test Data Visible
2022-01-25-1-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory02/02/202202/02/2022
Yes
02/04/2022Ok NeckingPublic - Test Data Visible
2022-01-25-1-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory02/02/202202/02/2022
Yes
02/04/2022Ok NeckingPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-01-25-1-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-01-25-1-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-01-25-1-3 CTM 670-December 2013 (Verified)