Sample Record

Owner Lab

  • CT D07 - Materials Field Laboratory, Unit 1953

DIME Sample ID 2022-01-12-5

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 214620
DEA: 07309304
EFIS: 0714000281
DIST-CO-RTE-PM07-LA-210,405,605-Various
Award Date03/18/2020
Closeout Date07/26/2022
Work DescriptionREINFORCE STRUCTURAL CONCRETE BRIDGE AND PLACE RHMA SHOULDER PAVING.
Location DescriptionLOS ANGELES COUNTY AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 04/15/2020)

Sample Information

Sample Taken Date01/12/2022 Sample Unique Key5
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/12/2022
Sample typeDepartment Acceptance A brief description of the sampleSubgrade
The quantity of what the sample constitutes310 SF From where was the sample collectedJob Site
First name of sampler or witnessed byMichelangelo Last name of sampler or witnessed bySese
Title of samplerTET Telephone number of sampler310-345-6204
Laboratory sample identification22-0056 Linked DIME Sample ID
The fabricator/manufacturer/facility nameNA Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleSubgrade
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedFrom various locations at subgrade
Where the material sample would have been placed if not sampled

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2022-01-12-5-1CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear GagesMichelangelo Sese, CT D07 - Materials Field Laboratory, Unit 195301/12/2022Michelangelo Sese
Yes
01/12/2022
2022-01-12-5-2CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and AggregatesMichelangelo Sese, CT D07 - Materials Field Laboratory, Unit 195301/12/2022Michelangelo Sese
Yes
01/12/2022

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-01-12-5-1 CTM 231-March 2013 (Verified)
DIME Test ID: 2022-01-12-5-2 CTM 216-June 2011 (Verified)