Sample Record
DIME Sample ID 2021-12-08-23
Sample is locked from editing. info
Project Information
| Project Identifiers | Project ID: 215425 DEA: 06360244 EFIS: 0613000005 |
|---|---|
| DIST-CO-RTE-PM | 06-TUL-99-30.6/35.2 |
| Award Date | 04/26/2021 |
| Closeout Date | 08/31/2026 |
| Work Description | Widen Freeway & Bridge Construction (Concrete Bridge) |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 11/01/2021) |
Owner Lab
- CT HQ - Sacramento Asphalt Binder Laboratory
Sample Information
| Sample Taken Date | 12/08/2021 | Sample Unique Key | 23 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 12/14/2021 | Sample type | Verification |
| A brief description of the sample | SS-1H 1jug emulsion | The quantity of what the sample constitutes | 1jug ss-1h |
| From where was the sample collected | Source | First name of sampler or witnessed by | Cesar |
| Last name of sampler or witnessed by | MANBUJANO | Title of sampler | ARE |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Not sure | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphaltic Emulsion | Emulsion Grade | SS-1h |
|---|---|---|---|
| Lot Number | Not set | Sub Lot | Not set |
| Dilution Percentage Rate | Not set |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2021-12-08-23-2 AASHTO T59-16 (Verified)
