Sample Record

DIME Sample ID 2021-11-17-2

Project Information

Project IdentifiersProject ID: 214620
DEA: 07309304
EFIS: 0714000281
DIST-CO-RTE-PM07-LA-210,405,605-Various
Award Date03/18/2020
Closeout Date07/26/2022
Work DescriptionREINFORCE STRUCTURAL CONCRETE BRIDGE AND PLACE RHMA SHOULDER PAVING.
Location DescriptionLOS ANGELES COUNTY AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 04/15/2020)

Owner Lab

  • CT D07 - Materials Field Laboratory, Unit 1953

Sample Information

Sample Taken Date11/17/2021 Sample Unique Key2
Date that the sample was received by the laboratory/organization performing the testing11/17/2021 Sample typeDepartment Acceptance
A brief description of the sampleAggregate Base The quantity of what the sample constitutes1610 sqft
From where was the sample collectedJob Site First name of sampler or witnessed byChad
Last name of sampler or witnessed byChotibhongs Title of samplerMREA
Telephone number of sampler213-817-0387 Laboratory sample identification21-2806
Linked DIME Sample ID The fabricator/manufacturer/facility nameNA
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)NA
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedCTM 231 Test Holes
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/8 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix NumberNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2021-11-17-2-1CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and AggregatesChad Chotibhongs, CT D07 - Materials Field Laboratory, Unit 195311/17/2021
No
2021-11-17-2-2CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear GagesChad Chotibhongs, CT D07 - Materials Field Laboratory, Unit 195311/17/2021
No
2021-11-17-2-3CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and AggregatesChad Chotibhongs, CT D07 - Materials Field Laboratory, Unit 195311/17/2021
No
2021-11-17-2-4CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear GagesChad Chotibhongs, CT D07 - Materials Field Laboratory, Unit 195311/17/2021
No

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-11-17-2-1 CTM 216-June 2011
DIME Test ID: 2021-11-17-2-2 CTM 231-March 2013
DIME Test ID: 2021-11-17-2-3 CTM 216-June 2011
DIME Test ID: 2021-11-17-2-4 CTM 231-March 2013