Sample Record

DIME Sample ID 2021-06-24-37

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 214293
DEA: 060S4604
EFIS: 0615000038
DIST-CO-RTE-PM06-FRE-99-R0.9/R5.0
Award Date12/05/2019
Closeout Date05/11/2023
Work DescriptionREPLACE CONCRETE AND ASPHALT PAVEMENT.
Location DescriptionFRESNO COUNTY IN AND NEAR KINGSBURG AND SELMA FROM ROUTE 99/201 SEPARATION TO 0.3 MILE SOUTH OF SECOND STREET UNDERCROSSING
QA Service Level1 (Verified on 08/05/2019)

Owner Lab

  • CT HQ - Sacramento Hot Mix Asphalt Laboratory

Sample Information

Sample Taken Date06/24/2021 Sample Unique Key37
Date that the sample was received by the laboratory/organization performing the testing10/12/2021 Sample typeDispute Resolution
A brief description of the sampleRAP The quantity of what the sample constitutes1 Bag
From where was the sample collectedManufacturer First name of sampler or witnessed byna
Last name of sampler or witnessed byna Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCMI Fresno
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Formc040331
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourcePlant
Aggregate Size Aggregate Source
RAP StockpileStatic Stockpile Size (tons)
Reclaimed Asphalt Pavement Mix NumberNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2021-06-24-37-1AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)Glenn Bradley, CT HQ - Sacramento Hot Mix Asphalt Laboratory11/08/2021
Yes
11/08/2021Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-06-24-37-1 AASHTO T30-19 (Verified)