Sample Record
DIME Sample ID 2021-08-16-61
Project Information
| Project Identifiers | Project ID: 215050 DEA: 080R1424 EFIS: 0815000201 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-40-R125.0/R154.6 |
| Award Date | 08/26/2020 |
| Closeout Date | 11/01/2022 |
| Work Description | ROADWAY EXCAVATION, IMPORT BORROW AND REGRADE THE MEDIAN SLOPE. |
| Location Description | SAN BERNARDINO COUNTY FROM 4.5 MILES EAST OF HOMER WASH BRIDGE TO ARIZONA STATE LINE |
| QA Service Level | 1 (Verified on 06/23/2021) |
Owner Lab
- Sequoia Consultants
Sample Information
| Sample Taken Date | 08/16/2021 | Sample Unique Key | 61 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/17/2021 | Sample type | Quality Control |
| A brief description of the sample | 6x12 concrete cylinders | The quantity of what the sample constitutes | 100 cyds |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Omar |
| Last name of sampler or witnessed by | Valdez | Title of sampler | Field Technician |
| Telephone number of sampler | Laboratory sample identification | C081621-201 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Cemex Bullhead City | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | DS119, 120, 133, 134 | |
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 1619144 |
|---|---|---|---|
| The truck number from where the sample was collected | 39800 | The batch plant ticket number from where the sample was collected | 44271468 |
| Concrete batch plant | Cemex Bullhead City | The fabricator/manufacturer designation for the sample | Mix |
| A detailed description of where the material sample was collected | Discharge chute from back of truck | Where the material sample would have been placed if not sampled | DS WW HW and footings |
| From Lot No. | Bag Lot No. |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| 2021-08-16-61-1 | CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders | Ruben Jimenez, Sequoia Consultants | 09/13/2021 | No |
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2021-08-16-61-1 CTM 521-June 2020
