Sample Record

DIME Sample ID 2021-09-20-45

Project Information

Project IdentifiersProject ID: 212252
DEA: 033F5604
EFIS: 0313000033
DIST-CO-RTE-PM03-SUT,YUB-20-17.0/17.1,0.0/0.4
Award Date02/11/2021
Closeout Date01/25/2023
Work DescriptionINSTALL CAST-IN-STEEL SHELL CONCRETE PILE.
Location DescriptionSUTTER AND YUBA COUNTIES IN YUBA CITY AND MARYSVILLE AT THE FEATHER RIVER BRIDGE AND OVERHEAD
QA Service Level1 (Verified on 04/27/2018)

Owner Lab

  • CT HQ - Sacramento Aggregate Testing Laboratory

Sample Information

Sample Taken Date09/20/2021 Sample Unique Key45
Date that the sample was received by the laboratory/organization performing the testing10/04/2021 Sample typePer Request
A brief description of the sampleFine Aggregate The quantity of what the sample constitutes1-5 gallon bucket
From where was the sample collectedJob Site First name of sampler or witnessed byna
Last name of sampler or witnessed byna Title of samplerna
Telephone number of sampler Laboratory sample identification21-PCCF-170
Linked DIME Sample ID The fabricator/manufacturer/facility nameField
Transportation Laboratory (TL) Numberna Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)not provided
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedfield
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Sizefine
The concrete mix design number Lot number
Sublot number Aggregate Mix NumberNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments