Sample Record
Owner Lab
- Trinity Engineering Laboratories, Incorporated - Fresno
DIME Sample ID 2020-12-30-22
Project Information
Project Identifiers | Project ID: 212324 DEA: 033F5104 EFIS: 0313000020 |
---|---|
DIST-CO-RTE-PM | 03-YUB-20-R18.1/R20.1 |
Award Date | 10/31/2019 |
Closeout Date | 08/03/2023 |
Work Description | Construct bridge, realign curve & widen shoulders. |
Location Description | Construction on state highway in Yuba County near Smartsville from the Yuba River Bridge to 0.3 mile east of Smartsville Road. |
QA Service Level | 1 (Verified on 02/27/2020) |
Sample Information
Sample Taken Date | 12/30/2020 | Sample Unique Key | 22 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/31/2020 |
Sample type | Quality Control | A brief description of the sample | PCC |
The quantity of what the sample constitutes | 4 cylinders | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Matthew | Last name of sampler or witnessed by | Horn |
Title of sampler | QC Technician | Telephone number of sampler | 5593928776 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | A and A Concrete Supply Inc | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | Z5605210 |
---|---|---|---|
The truck number from where the sample was collected | 0515 | The batch plant ticket number from where the sample was collected | 29003314 |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Truck | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Submitted Tests
DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Submitted By | Verified? | Release Date | Test Comments | Actions |
---|---|---|---|---|---|---|---|---|
2020-12-30-22-1 | ASTM C143-10a: Standard Test Method for Slump of Hydraulic-Cement Concrete | Matthew Horn, Trinity Engineering Laboratories, Incorporated - Fresno | 12/30/2020 | Christen Guilmette | No | Info | ||
2020-12-30-22-2 | CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method | Matthew Horn, Trinity Engineering Laboratories, Incorporated - Fresno | 12/30/2020 | Christen Guilmette | No | Info | ||
2020-12-30-22-3 | CTM 557-July 2012: Method of Test for Temperature of Freshly Mixed Portland Cement Concrete | Matthew Horn, Trinity Engineering Laboratories, Incorporated - Fresno | 12/30/2020 | Christen Guilmette | No | Info | ||
2020-12-30-22-4 | CTM 521-June 2012: Method of Test for Compressive Strength of Molded Concrete Cylinders | Joshua Guilmette, Trinity Engineering Laboratories, Incorporated - Fresno | 01/27/2021 | Christen Guilmette | No | Info |
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2020-12-30-22-1 ASTM C143-10a
DIME Test ID: 2020-12-30-22-2 CTM 504-June 2010
DIME Test ID: 2020-12-30-22-3 CTM 557-July 2012
DIME Test ID: 2020-12-30-22-4 CTM 521-June 2012