Sample Record

DIME Sample ID 2021-07-07-3

Project Information

Project IdentifiersProject ID: 212571
DEA: 051F79A4
EFIS: 0514000061
DIST-CO-RTE-PM05-SB-101-55.9/R56.2
Award Date09/13/2022
Closeout Date07/02/2026
Work DescriptionNojoqui Creek Bridge (51-0018 L/R) widening and rail replacement.
Location DescriptionIN SANTA BARBARA COUNTY NEAR BUELLTON AT NOJOQUI CREEK BRIDGE (BR #51-0018 L/R)
QA Service Level1 (Verified on 02/20/2020)

Owner Lab

  • CT HQ - QASI Los Angeles Field Office

Sample Information

Sample Taken Date07/07/2021 Sample Unique Key3
Date that the sample was received by the laboratory/organization performing the testingNot set Sample typeQuality Control
A brief description of the sampleUBS Hoops The quantity of what the sample constitutes243 Hoops
From where was the sample collectedFabricator First name of sampler or witnessed byDavid
Last name of sampler or witnessed byWeeks Title of samplerASI
Telephone number of sampler3108838369 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCMC Rebar Etiwanda
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Welded Hoops Production or Authorization TestingProduction Testing
Service or UltimateUltimate Rebar Heat Number(s)4108651
Hoop Manufacturer Lot Number(s)1 and 2 Material Standard CodeASTM A706
Material Grade60 Rebar Size#5
Diameter of Hoop1'-11" Epoxy CoatedNo
Epoxy Coating ColorNA Rebar ManufacturerCMC
Welding CompanyCMC Etiwanda Coating StandardsUncoated
Weld TypeFlash Welded

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments