Sample Record

DIME Sample ID 2021-06-29-13

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 214951
DEA: 120K0234
EFIS: 1214000100
DIST-CO-RTE-PM12-ORA-5-17.1/18.9
Award Date09/23/2020
Closeout Date02/09/2026
Work DescriptionSouth County Improvement Project (Phase 3 - El Toro/Alicia) WIDEN FREEWAY AND BRIDGES, RECONSTRUCT BRIDGE AND WALLS.
Location DescriptionORANGE COUNTY IN MISSION VIEJO, LAGUNA HILLS, LAGUNA WOODS AND LAKE FOREST FROM 0.4 MILE SOUTH OF ALICIA PARKWAY OVERCROSSING TO 0.2 MILE NORTH OF EL TORO ROAD UNDERCROSSING
QA Service Level1 (Verified on 10/01/2020)

Owner Lab

  • CT HQ - QASI Los Angeles Field Office

Sample Information

Sample Taken Date06/29/2021 Sample Unique Key13
Date that the sample was received by the laboratory/organization performing the testing07/02/2021 Sample typeQuality Assurance
A brief description of the sample#5 x 2'-2" dia. The quantity of what the sample constitutes4 hoops
From where was the sample collectedFabricator First name of sampler or witnessed byOsiel
Last name of sampler or witnessed byRamirez Title of sampler
Telephone number of sampler5599740870 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameRKR Steel Welding
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) FormL123-076-21
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Welded Hoops Production or Authorization TestingProduction Testing
Service or UltimateUltimate Rebar Heat Number(s)1201022826
Hoop Manufacturer Lot Number(s)Lot 2 Material Standard CodeASTM A706
Material Grade60 Rebar Size#5
Diameter of Hoop2'-2" Epoxy CoatedNo
Epoxy Coating ColorNA Rebar ManufacturerNucor
Welding CompanyRKR Steel Welding Coating StandardsUncoated
Weld TypeFlash Welded

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2021-06-29-13-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory07/01/202107/01/2021
Yes
07/01/2021OK NeckingPublic - Test Data Visible
2021-06-29-13-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory07/01/202107/01/2021
Yes
07/01/2021OK NeckingPublic - Test Data Visible
2021-06-29-13-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory07/01/202107/01/2021
Yes
07/01/2021Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-06-29-13-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-06-29-13-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-06-29-13-3 CTM 670-December 2013 (Verified)