Sample Record

DIME Sample ID 2021-05-21-29

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 215014
DEA: 101C9404
EFIS: 1016000020
DIST-CO-RTE-PM10-SJ-5-26.4/27.0
Award Date11/03/2020
Closeout Date03/03/2022
Work DescriptionBRIDGE REHABILITATION
Location DescriptionON STATE HIGHWAY IN SAN JOAQUIN COUNTY IN STOCKTON FROM 0.3 MILE NORTH OF ROUTE 5/4 SEPARATION TO PERSHING AVENUE
QA Service Level1 (Verified on 06/03/2020)

Owner Lab

  • CT HQ - Sacramento Concrete Testing Laboratory

Sample Information

Sample Taken Date05/21/2021 Sample Unique Key29
Date that the sample was received by the laboratory/organization performing the testing05/21/2021 Sample typeAuthorization
A brief description of the samplerapid set patching The quantity of what the sample constitutes2 Bags
From where was the sample collectedManufacturer First name of sampler or witnessed byThao
Last name of sampler or witnessed byVu Title of samplerQC Specialist
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameSika Corporation
Transportation Laboratory (TL) NumberC063 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeRapid Set ManufacturerSika Corporation
Mix no.3522 Materials ReceivedSikaquick 2500
Lot no.3005496399 Batch Number05192109

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2021-05-21-29-1CONCLP 2-16: Rapid Set Patching MaterialsSpencer Adams, CT HQ - Sacramento Concrete Testing Laboratory06/25/2021
Yes
06/25/2021Initial Time of Set: 20 min / Final Time of Set: 28 minPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-05-21-29-1 CONCLP 2-16 (Verified)