Sample Record
Owner Lab
- CT D08 - Fontana Southern Regional Laboratory
DIME Sample ID 2021-06-08-6
Sample is locked from editing. info
Project Information
| Project Identifiers | Project ID: 215149 DEA: 081G0104 EFIS: 0815000106 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-62-124.8/142.0 |
| Award Date | 10/21/2020 |
| Closeout Date | 01/18/2022 |
| Work Description | PLACE RHMA-G, HMA, STRUCTURAL CONCRETE & ROCK SLOPE PROTECTION. |
| Location Description | SAN BERNARDINO COUNTY AT VARIOUS LOCATIONS FROM 1.8 MILES WEST OF ROUTE 95 TO 0.3 MILE WEST OF PARKER DAM ROAD. |
| QA Service Level | 1 (Verified on 01/28/2021) |
Sample Information
| Sample Taken Date | 06/08/2021 | Sample Unique Key | 6 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/09/2021 |
| Sample type | Verification | A brief description of the sample | PSUE 1/2" RHMA-G 0.5% LAS |
| The quantity of what the sample constitutes | 3 Bags Combined Agg,3 Bags Rockdust,4 Bags Birds Eye | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Kevin | Last name of sampler or witnessed by | Oluoha |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 0344G-21 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Granite Construction Company Indio | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0072 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | 1/2 RHMA-G-SP | The fabricator/manufacturer designation for the sample | |
| The plant number | 1346 | A detailed description of where the material sample was collected | Belt Cut at Granite Indio Plant |
| Where the material sample would have been placed if not sampled | Asphalt Paving | Primary Aggregate Nominal Size | 1/2 inch |
| The concrete mix design number | Lot number | 1 | |
| Sublot number | 1 | Aggregate Mix Number | Not set |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2021-06-08-6-1 AASHTO T27-14 (Verified)
DIME Test ID: 2021-06-08-6-2 AASHTO T84-14 (Verified)
DIME Test ID: 2021-06-08-6-3 AASHTO T85-13 (Verified)
DIME Test ID: 2021-06-08-6-4 AASHTO T96-02r10 (Verified)
DIME Test ID: 2021-06-08-6-5 AASHTO T176-08 (Verified)
DIME Test ID: 2021-06-08-6-6 AASHTO T304-11 (Verified)
DIME Test ID: 2021-06-08-6-7 AASHTO T335-09r13 (Verified)
DIME Test ID: 2021-06-08-6-8 ASTM D4791-10 (Verified)
