Sample Record

DIME Sample ID 2021-04-01-41

Project Information

Project IdentifiersProject ID: 214426
DEA: 030A5704
EFIS: 0300020593
DIST-CO-RTE-PM03-YUB-20-13.3/R18.2
Award Date01/02/2020
Closeout Date07/15/2025
Work DescriptionBrowns Valley Rehab: CONSTRUCT BRIDGE, REALIGN CURVE, WIDEN SHOULDERS AND CULVERT WORK.
Location DescriptionYUBA COUNTY FROM MARYSVILLE ROAD TO THE YUBA RIVER BRIDGE
QA Service Level1 (Verified on 10/23/2019)

Owner Lab

  • CT D03 - Olivehurst Northern Regional Laboratory

Sample Information

Sample Taken Date04/01/2021 Sample Unique Key41
Date that the sample was received by the laboratory/organization performing the testing04/01/2021 Sample typeVerification
A brief description of the samplePG 64-16 Marathon The quantity of what the sample constitutesJMF Verification
From where was the sample collectedManufacturer First name of sampler or witnessed byTeichert Personnel (SAMPLER)
Last name of sampler or witnessed by Brad McKeehan (WITNESS) Title of samplerUnknown
Telephone number of samplerUnknown Laboratory sample identificationJMF21-020C
Linked DIME Sample ID The fabricator/manufacturer/facility nameTeichert - Hallwood Plant
Transportation Laboratory (TL) NumberC706329 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphalt Binder Performance GradePG 64-16
ModifiedNo Lot number
Sublot number Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierMarathon Petroleum Co. LP - Elk Grove CA MultigradeNo
Multigrade TypeNot set Asphalt Binder Mix NumberNot set
HMA TypeNot set HMA Supplier Mix ID NumberNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments