Sample Record

DIME Sample ID 2021-04-27-27

Project Information

Project IdentifiersProject ID: 214511
DEA: 010E0004
EFIS: 0113000091
DIST-CO-RTE-PM01-HUM-101-84.4/84.8
Award Date01/29/2020
Closeout Date11/22/2023
Work DescriptionBRIDGE RAIL REPLACEMENT.
Location DescriptionHUMBOLDT COUNTY NEAR ARCATA FROM JACOBY CREEK BRIDGE TO GANNON SLOUGH BRIDGE
QA Service Level1 (Verified on 11/13/2019)

Owner Lab

  • CT HQ - Sacramento Hot Mix Asphalt Laboratory

Sample Information

Sample Taken Date04/27/2021 Sample Unique Key27
Date that the sample was received by the laboratory/organization performing the testing05/25/2021 Sample typeDispute Resolution
A brief description of the sample1/2" HMA NO RAP The quantity of what the sample constitutes_
From where was the sample collectedManufacturer First name of sampler or witnessed by_
Last name of sampler or witnessed by_ Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameMercer Fraser - Fortuna
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading1/2 inch Lot number
Sublot number HMA Mix NumberNot set
Binder content (%)Not set Virgin binder PGNot set
Design binder PGNot set Binder SupplierNot set
RAP content (%)Not set WMA AdditivesNot set
Antistrip typeNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments