Sample Record
Owner Lab
- CT D08 - Fontana Southern Regional Laboratory
DIME Sample ID 2021-04-23-10
Sample is locked from editing. info
Project Information
| Project Identifiers | Project ID: 215188 DEA: 080F5434 EFIS: 0817000239 Permit Numbers: 0823NMC0369 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-I-15,SR-91-6.1-7.6 |
| Award Date | 03/11/2020 |
| Closeout Date | 06/05/2024 |
| Work Description | I-15 ELC: 15/91 Express Lanes Connector Project (ELC) |
| Location Description | Junction of I-15 and SR-91 in Corona, CA |
| QA Service Level | 1 (Verified on 09/16/2020) |
Sample Information
| Sample Taken Date | 04/23/2021 | Sample Unique Key | 10 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/29/2021 |
| Sample type | Verification | A brief description of the sample | PSUE 3/4" HMA-A-SP R15 No LAS |
| The quantity of what the sample constitutes | 4 Bags Of Combined Aggregate | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | AAA | Last name of sampler or witnessed by | QC |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 0244A-21 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | AAA-Corona | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0005 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | 3/4 HMA-A-SP R15 | The fabricator/manufacturer designation for the sample | |
| The plant number | 105973 | A detailed description of where the material sample was collected | Belt Cut at All American Corona Plant |
| Where the material sample would have been placed if not sampled | Asphalt Paving | Primary Aggregate Nominal Size | 3/4 inch |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number | Not set |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2021-04-23-10-1 AASHTO T27-14 (Verified)
DIME Test ID: 2021-04-23-10-3 AASHTO T85-13 (Verified)
DIME Test ID: 2021-04-23-10-4 AASHTO T84-14 (Verified)
DIME Test ID: 2021-04-23-10-5 AASHTO T96-02r10 (Verified)
DIME Test ID: 2021-04-23-10-6 AASHTO T176-08 (Verified)
DIME Test ID: 2021-04-23-10-7 ASTM D4791-10 (Verified)
DIME Test ID: 2021-04-23-10-8 AASHTO T304-11 (Verified)
DIME Test ID: 2021-04-23-10-9 CTM 202-November 2011 (Verified)
DIME Test ID: 2021-04-23-10-10 CTM 202-November 2011 (Verified)
DIME Test ID: 2021-04-23-10-11 AASHTO T335-09r13 (Verified)
