Sample Record

DIME Sample ID 2021-04-02-18

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 214671
DEA: 07303904
EFIS: 0714000044
DIST-CO-RTE-PM07-LA-10-31.2/37.2
Award Date11/25/2020
Closeout Date10/11/2023
Work DescriptionLANE REPLACEMENT
Location DescriptionLOS ANGELES COUNTY IN BALDWIN PARK AND WEST COVINA FROM 0.1 MILE EAST OF THE 10/605 SEPARATION TO 0.3 MILE WEST OF CITRUS STREET OVERCROSSING
QA Service Level1 (Verified on 01/21/2021)

Owner Lab

  • CT HQ - Sacramento Concrete Testing Laboratory

Sample Information

Sample Taken Date04/02/2021 Sample Unique Key18
Date that the sample was received by the laboratory/organization performing the testing04/16/2021 Sample typeQuality Assurance
A brief description of the sampleRapid Setting Concrete The quantity of what the sample constitutes2 Bags
From where was the sample collectedManufacturer First name of sampler or witnessed byJay
Last name of sampler or witnessed byWest Title of samplerQuality Specialist
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCTS Cement
Transportation Laboratory (TL) NumberC029 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeRapid Set ManufacturerCTS Cement Manufacturing Corporation
Mix no.3513 Materials ReceivedRapid Set DOT Repair Mix
Lot no.23104091 Batch Number23104091

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2021-04-02-18-1CONCLP 2-16: Rapid Set Patching MaterialsMike Mullins, CT HQ - Sacramento Concrete Testing Laboratory04/22/2021
Yes
04/22/2021Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-04-02-18-1 CONCLP 2-16 (Verified)