Sample Record

DIME Sample ID 2021-03-05-26

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 213903
DEA: 043G4544
EFIS: 0412000054
DIST-CO-RTE-PM04-ALA,SM-92-R14.4/R18.8,R0.0/R.2.4
Award Date12/31/2019
Closeout Date04/04/2025
Work DescriptionRepair Spalled Concrete Columns and Spandrel Beams
Location DescriptionSan Mateo-Hayward Bridge
QA Service Level1 (Verified on 01/22/2019)

Owner Lab

  • CT HQ - Sacramento Concrete Testing Laboratory

Sample Information

Sample Taken Date03/05/2021 Sample Unique Key26
Date that the sample was received by the laboratory/organization performing the testing03/08/2021 Sample typeQuality Assurance
A brief description of the sampleRapid Setting Concrete The quantity of what the sample constitutes2 Bags
From where was the sample collectedJob Site First name of sampler or witnessed byWill
Last name of sampler or witnessed byReames Title of samplerGolden State Bridge
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameSika Corporation
Transportation Laboratory (TL) NumberC902229 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeRapid Set ManufacturerSika Corporation
Mix no.3503 Materials ReceivedSikaquick FNP
Lot no.3005115173 Batch Number3005115173

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2021-03-05-26-1CONCLP 2-16: Rapid Set Patching MaterialsSpencer Adams, CT HQ - Sacramento Concrete Testing Laboratory04/20/2021
Yes
04/20/2021Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-03-05-26-1 CONCLP 2-16 (Verified)