Sample Record

DIME Sample ID 2021-03-11-14

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 215254
DEA: 031G5104
EFIS: 0318000313
DIST-CO-RTE-PM03-BUT,COL,GLE,SUT,YOL-5,32,70,80,162-VAR
Award Date12/16/2020
Closeout Date09/27/2021
Work DescriptionREMOVE & PLACE POLYESTER CONC OVERLAY, PLACE JOINT SEAL & HMA.
Location DescriptionBUTTE, COLUSA, GLENN, SUTTER, AND YOLO COUNTIES AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 11/11/2020)

Owner Lab

  • CT HQ - Sacramento Concrete Testing Laboratory

Sample Information

Sample Taken Date03/11/2021 Sample Unique Key14
Date that the sample was received by the laboratory/organization performing the testing04/08/2021 Sample typeQuality Assurance
A brief description of the sampleRapid Setting Concrete The quantity of what the sample constitutes2 Bags
From where was the sample collectedManufacturer First name of sampler or witnessed byThao
Last name of sampler or witnessed byVu Title of samplerQC Specialist
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameSika Corporation
Transportation Laboratory (TL) NumberC027 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeRapid Set ManufacturerSika Corporation
Mix no.3511 Materials ReceivedSikaquick 2500
Lot no.3005332931 Batch Number03102101W

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2021-03-11-14-1CONCLP 2-16: Rapid Set Patching MaterialsSpencer Adams, CT HQ - Sacramento Concrete Testing Laboratory04/20/2021
Yes
04/20/2021Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-03-11-14-1 CONCLP 2-16 (Verified)