Sample Record
Owner Lab
- Sequoia Consultants
DIME Sample ID 2020-07-07-27
Project Information
| Project Identifiers | Project ID: 213970 DEA: 080K1214 EFIS: 0815000245 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-15-12.5/14.8 |
| Award Date | 12/23/2019 |
| Closeout Date | 01/18/2022 |
| Work Description | REPLACE PCC PAVEMENT WITH JPCP AND PRECAST JOINTED CONCRETE PAVEMENT. |
| Location Description | SAN BERNARDINO COUNTY IN FONTANA AND NEAR DEVORE FROM 0.3 MILE SOUTH OF SIERRA AVENUE UNDERCROSSING TO GLEN HELEN PARKWAY UNDERCROSSING |
| QA Service Level | 1 (Verified on 12/12/2019) |
Sample Information
| Sample Taken Date | 07/07/2020 | Sample Unique Key | 27 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/08/2020 |
| Sample type | Informational | A brief description of the sample | CTE |
| The quantity of what the sample constitutes | project | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Eric | Last name of sampler or witnessed by | Jimenez |
| Title of sampler | Field Technician | Telephone number of sampler | |
| Laboratory sample identification | C070720-100A-100B-100C-100D | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Cemex Lytle Creek | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | NB I-15 | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 1605760 |
|---|---|---|---|
| The truck number from where the sample was collected | 7842 | The batch plant ticket number from where the sample was collected | 29101292 |
| Concrete batch plant | Cemex Lytle Creek | The fabricator/manufacturer designation for the sample | Batch |
| A detailed description of where the material sample was collected | Back of Truck | Where the material sample would have been placed if not sampled | NB I15 lane 4 |
| From Lot No. | Bag Lot No. |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| 2020-07-07-27-1 | AASHTO T336-15: Standard Method of Test for Coefficient of Thermal Expansion of Hydraulic Cement Concrete | Ruben Jimenez, Sequoia Consultants | 08/13/2020 | No | |||||
| 2020-07-07-27-2 | AASHTO T336-15: Standard Method of Test for Coefficient of Thermal Expansion of Hydraulic Cement Concrete | Ruben Jimenez, Sequoia Consultants | 08/13/2020 | No | |||||
| 2020-07-07-27-3 | AASHTO T336-15: Standard Method of Test for Coefficient of Thermal Expansion of Hydraulic Cement Concrete | Ruben Jimenez, Sequoia Consultants | 08/13/2020 | No | |||||
| 2020-07-07-27-4 | AASHTO T336-15: Standard Method of Test for Coefficient of Thermal Expansion of Hydraulic Cement Concrete | Ruben Jimenez, Sequoia Consultants | 08/13/2020 | No |
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2020-07-07-27-1 AASHTO T336-15
DIME Test ID: 2020-07-07-27-2 AASHTO T336-15
DIME Test ID: 2020-07-07-27-3 AASHTO T336-15
DIME Test ID: 2020-07-07-27-4 AASHTO T336-15