Sample Record

DIME Sample ID 2021-03-17-28

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 215129
DEA: 050N73U4
EFIS: 0520000166
DIST-CO-RTE-PM05-SB-101-7.3/9.6
Award Date10/22/2020
Closeout Date12/11/2023
Work Description!!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar,
Location DescriptionSUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE
QA Service Level1 (Verified on 08/24/2020)

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

Sample Information

Sample Taken Date03/17/2021 Sample Unique Key28
Date that the sample was received by the laboratory/organization performing the testing03/30/2021 Sample typeQuality Assurance
A brief description of the sampleHRC 500/510 Couplers The quantity of what the sample constitutes150
From where was the sample collectedJob Site First name of sampler or witnessed byJosh
Last name of sampler or witnessed byMadrigal Title of samplerASR
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCMC Rebar
Transportation Laboratory (TL) NumberC761569 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC
Coupler ManufacturerHRC Intermediate Assembler or Fabricator
Rebar Size#9 Coupler ModelHRC 500/510
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)A196207, 73116792 Rebar Heat Number(s)4106105
Rebar Size 2 Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2021-03-17-28-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)<None>, CT HQ - Sacramento Structural Materials Testing Laboratory03/30/202103/30/2021
Yes
03/30/2021OK NeckingPublic - Test Data Visible
2021-03-17-28-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory03/30/202103/30/2021
Yes
03/30/2021OK NeckingPublic - Test Data Visible
2021-03-17-28-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory03/30/202103/30/2021
Yes
03/30/2021OK NeckingPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-03-17-28-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-03-17-28-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-03-17-28-3 CTM 670-December 2013 (Verified)