Sample Record
Owner Lab
- CT D08 - Fontana Southern Regional Laboratory
DIME Sample ID 2021-02-19-32
Sample is locked from editing. info
Project Information
| Project Identifiers | Project ID: 213764 DEA: 080F0304 EFIS: 0800020358 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-60-R0.7/R3.0 |
| Award Date | 03/07/2019 |
| Closeout Date | 07/27/2023 |
| Work Description | REMOVE AND REPLACE THREE OVERCROSSING BRIDGES ON ROUTE 60 |
| Location Description | IN SAN BERNARDINO COUNTY IN AND NEAR CHINO AT VARIOUS LOCATIONS FROM O.1 MILE WEST OF PIPELINE AVENUE OVERCROSSING TO 0.1 MILE EAST OF BENSON AVENUE OVERCROSSING |
| QA Service Level | 1 (Verified on 05/01/2019) |
Sample Information
| Sample Taken Date | 02/19/2021 | Sample Unique Key | 32 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/22/2021 |
| Sample type | Department Acceptance | A brief description of the sample | Acceptance 3/4" HMA-A-SP R15 0.5% LAS |
| The quantity of what the sample constitutes | 2 Bags of Colfeed, 1 Bag of RAP | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | RJ Noble Company Corona | Last name of sampler or witnessed by | QC |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 0151A-21 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | RJ Noble Company | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0014, 91-33-0039 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | 3/4 HMA-SP R15 | The fabricator/manufacturer designation for the sample | |
| The plant number | 36R1504SPWC | A detailed description of where the material sample was collected | Belt Cut at RJ Noble Corona Plant |
| Where the material sample would have been placed if not sampled | Asphalt Paving | Primary Aggregate Nominal Size | 3/4 inch |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number | Not set |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2021-02-19-32-1 AASHTO T27-14 (Verified)
DIME Test ID: 2021-02-19-32-2 AASHTO T176-08 (Verified)
DIME Test ID: 2021-02-19-32-3 CTM 202-November 2011 (Verified)
DIME Test ID: 2021-02-19-32-4 CTM 202-November 2011 (Verified)