Sample Record

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

DIME Sample ID 2021-01-14-7

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 214227
DEA: 100Q1214
EFIS: 1014000167
DIST-CO-RTE-PM10-MER-99-28.2/R37.3
Award Date12/04/2019
Closeout Date12/05/2022
Work DescriptionPLACE REINFORCED CONCRETE PAVEMENT, HMA & FIBER OPTIC CABLE SYSTEM.
Location DescriptionMERCED COUNTY IN AND NEAR LIVINGSTON FROM 0.8 MILE SOUTH OF HAMMATT AVENUE OVERCROSSING TO STANISLAUS COUNTY LINE
QA Service Level1 (Verified on 06/26/2019)

Sample Information

Sample Taken Date01/14/2021 Sample Unique Key7
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/15/2021
Sample typeQuality Assurance A brief description of the sampleBar Lock Coupler
The quantity of what the sample constitutes4 From where was the sample collectedJob Site
First name of sampler or witnessed byJO Last name of sampler or witnessed byAkabogn
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCMC Rebar Erico Transportation Laboratory (TL) NumberC10Q1214QA
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC Rebar
Coupler ManufacturerErico Intermediate Assembler or Fabricator
Rebar Size#11 Coupler ModelBar Lock
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)C0026 Rebar Heat Number(s)4102989
Rebar Size 2 Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2021-01-14-7-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory01/19/2021fsaylor
Yes
01/19/2021Service Splice
2021-01-14-7-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory01/19/2021fsaylor
Yes
01/19/2021Service Splice
2021-01-14-7-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory01/19/2021fsaylor
Yes
01/19/2021Service Splice

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-01-14-7-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-01-14-7-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-01-14-7-3 CTM 670-December 2013 (Verified)