Sample Record

DIME Sample ID 2020-12-12-2

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 214701
DEA: 030F2844
EFIS: 0319000204
DIST-CO-RTE-PM03-SAC-99-7.1/9.4
Award Date05/14/2020
Closeout Date11/27/2023
Work DescriptionConstruct new PCC precast girder bridge over UPRR at McConnell OH between existing SB and NB alignments
Location DescriptionNot set
QA Service Level1 (Verified on 04/20/2020)

Owner Lab

  • CT HQ - Sacramento Asphalt Binder Laboratory

Sample Information

Sample Taken Date12/12/2020 Sample Unique Key2
Date that the sample was received by the laboratory/organization performing the testing12/18/2020 Sample typeDepartment Acceptance
A brief description of the sampleEmulsion The quantity of what the sample constitutes1 of 1
From where was the sample collectedJob Site First name of sampler or witnessed byMark
Last name of sampler or witnessed byMahoney Title of samplermaterials tester
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility namePacific Northwest
Transportation Laboratory (TL) Numberc764884 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphaltic Emulsion Emulsion GradeSS-1h
Lot NumberNot set Sub LotNot set
Dilution Percentage RateNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2020-12-12-2-1AASHTO T59-16: Standard Method of Test for Emulsified Asphalts (Emulsified Asphalt Residue Evap. (Sec. 7))Eva Torres, CT HQ - Sacramento Asphalt Binder Laboratory12/22/2020
Yes
12/22/2020Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2020-12-12-2-1 AASHTO T59-16 (Verified)