Sample Record

DIME Sample ID 2020-07-10-36

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 214756
DEA: 050N7AU4
EFIS: 0520000030
DIST-CO-RTE-PM05-SB-101-1.4/4.8
Award DateNot set
Closeout Date09/27/2022
Work DescriptionSegment 4A - Carpinteria: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, epoxy coated rebar, precast box culverts, precast RCP.
Location DescriptionCARPINTERIA FROM 0.2 MILE SOUTH OF BAILARD AVENUE OVERCROSSING TO 0.7 MILE SOUTH OF SOUTH PADARO LANE
QA Service Level1 (Verified on 03/09/2020)

Owner Lab

  • Sequoia Consultants

Sample Information

Sample Taken Date07/10/2020 Sample Unique Key36
Date that the sample was received by the laboratory/organization performing the testing07/11/2020 Sample typeQuality Control
A brief description of the sampleConcrete The quantity of what the sample constitutes100 cy
From where was the sample collectedJob Site First name of sampler or witnessed byJosh
Last name of sampler or witnessed byHua Title of samplerField Technician
Telephone number of sampler Laboratory sample identificationC071020-101
Linked DIME Sample ID The fabricator/manufacturer/facility nameHanson Goleta
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameFranklin Creek Bridge Deck
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number72F1S0Z
The truck number from where the sample was collected550 The batch plant ticket number from where the sample was collected543205
Concrete batch plantHanson Goleta The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedReady Mix Chute Where the material sample would have been placed if not sampledFranklin Creek Bridge Deck
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2020-07-10-36-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersCarlos Fuentes , Sequoia Consultants08/07/2020
Yes
09/16/2020Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2020-07-10-36-1 CTM 521-June 2020 (Verified)