Sample Record

DIME Sample ID 2020-09-10-4

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 214176
DEA: 033F0904
EFIS: 0312000056
DIST-CO-RTE-PM03-SAC,SJ-5,160-Var
Award Date10/10/2019
Closeout Date10/27/2022
Work DescriptionREPLACE STRUCTURAL CONCRETE BRIDGES, PLACE CIDH & CISS CONCRETE PILES.
Location DescriptionSACRAMENTO COUNTY AT NORTH SACRAMENTO UNDERCROSSING AND SACRAMENTO RIVER BRIDGE AND IN SAN JOAQUIN COUNTY AT MOKELUMNE RIVER BRIDGE
QA Service Level1 (Verified on 05/29/2019)

Owner Lab

  • CT HQ - QASI Bay Area Field Office

Sample Information

Sample Taken Date09/10/2020 Sample Unique Key4
Date that the sample was received by the laboratory/organization performing the testing09/11/2020 Sample typeQuality Assurance
A brief description of the sampleHRC 500 510 Couplers The quantity of what the sample constituteslot of 150 bars
From where was the sample collectedFabricator First name of sampler or witnessed bySaman
Last name of sampler or witnessed byBarzegari Title of samplerAssistant Materials Representative
Telephone number of sampler7076495471 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCamblin Steel Service, Benicia
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) FormB384-002-20
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC Steel Arizona
Coupler ManufacturerHRC Intermediate Assembler or FabricatorCamblin Steel
Rebar Size#11 Coupler ModelHRC 500-510
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)500 / 73116792 510 / 73117653 Rebar Heat Number(s)4099233
Rebar Size 2 Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2020-09-10-4-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory09/11/202009/11/2020
Yes
09/11/2020OK NeckingPublic - Test Data Visible
2020-09-10-4-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory09/11/202009/11/2020
Yes
09/11/2020OK NeckingPublic - Test Data Visible
2020-09-10-4-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory09/11/202009/11/2020
Yes
09/11/2020OK NeckingPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2020-09-10-4-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2020-09-10-4-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2020-09-10-4-3 CTM 670-December 2013 (Verified)