Sample Record
Owner Lab
- CT D08 - Fontana Southern Regional Laboratory
DIME Sample ID 2020-08-17-3
Sample is locked from editing. info
Project Information
| Project Identifiers | Project ID: 213477 DEA: 080H4704 EFIS: 0812000074 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-2-2.44 |
| Award Date | 09/28/2018 |
| Closeout Date | 01/18/2022 |
| Work Description | WIDEN BRIDGE TO ACCOMMODATE STANDARD SHOULDERS |
| Location Description | AT WRIGHTWOOD AT SHEEP CREEK BRIDGE |
| QA Service Level | 1 (Verified on 12/31/2018) |
Sample Information
| Sample Taken Date | 08/17/2020 | Sample Unique Key | 3 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/17/2020 |
| Sample type | Verification | A brief description of the sample | PSUE 3/4" HMA-A-SP R15 No LAS |
| The quantity of what the sample constitutes | 2 Bags Of Combined Coldfeed Agg., 2 Bags Rap | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Victor | Last name of sampler or witnessed by | Capacete |
| Title of sampler | QC Technician | Telephone number of sampler | |
| Laboratory sample identification | 0505A-20 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | All American Asphalt - Corona | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0005 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | 3/4 HMA-A-SP R15 | The fabricator/manufacturer designation for the sample | |
| The plant number | 105927 | A detailed description of where the material sample was collected | Belt Cut at All American Corona |
| Where the material sample would have been placed if not sampled | Asphalt Paving | Primary Aggregate Nominal Size | 3/4 inch |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number | Not set |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2020-08-17-3-1 AASHTO T27-14 (Verified)
DIME Test ID: 2020-08-17-3-2 AASHTO T335-09r13 (Verified)
DIME Test ID: 2020-08-17-3-3 AASHTO T85-13 (Verified)
DIME Test ID: 2020-08-17-3-4 AASHTO T84-14 (Verified)
DIME Test ID: 2020-08-17-3-5 AASHTO T96-02r10 (Verified)
DIME Test ID: 2020-08-17-3-6 AASHTO T176-08 (Verified)
DIME Test ID: 2020-08-17-3-7 ASTM D4791-10 (Verified)
DIME Test ID: 2020-08-17-3-8 AASHTO T304-11 (Verified)
DIME Test ID: 2020-08-17-3-9 CTM 202-November 2011 (Verified)
DIME Test ID: 2020-08-17-3-10 CTM 202-November 2011 (Verified)
