Sample Record

DIME Sample ID 2020-06-16-21

Project Information

Project IdentifiersProject ID: 213274
DEA: 010C8104
EFIS: 0113000060
DIST-CO-RTE-PM01-LAK-20,53-31.1/31.8,7.0/7.4
Award Date06/11/2018
Closeout Date07/09/2021
Work DescriptionCONSTRUCT ROUNDABOUT
Location DescriptionLAKE COUNTY NEAR CLEARLAKE OAKS ON ROUTE 20 FROM 0.5 MILE WEST TO 0.2 MILE EAST OF ROUTE 53 AND ON ROUTE 53 FROM 0.4 MILE SOUTH OF ROUTE 20 TO ROUTE 20
QA Service Level1 (Verified on 04/27/2018)

Owner Lab

  • CT HQ - Sacramento Asphalt Binder Laboratory

Sample Information

Sample Taken Date06/16/2020 Sample Unique Key21
Date that the sample was received by the laboratory/organization performing the testing06/19/2020 Sample typeDepartment Acceptance
A brief description of the sampleEMULSION The quantity of what the sample constitutes2 bottles
From where was the sample collectedJob Site First name of sampler or witnessed byAlfredo
Last name of sampler or witnessed byCervantes Title of samplerOperator
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility namePacific Northwest Oil - Stockton, CA
Transportation Laboratory (TL) Number036326 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphaltic Emulsion Emulsion GradeSS-1h
Lot Number0 Sub Lot0
Dilution Percentage RateNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2020-06-16-21-1AASHTO T59-16: Standard Method of Test for Emulsified Asphalts (Residue and Oil Distillate (Sec. 6))Juan Gomez, CT HQ - Sacramento Asphalt Binder Laboratory06/23/2020
Yes
06/23/2020Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2020-06-16-21-1 AASHTO T59-16 (Verified)