Sample Record
Owner Lab
- CT HQ - QASI Bay Area Field Office
DIME Sample ID 2013-11-15-8305233
Project Information
| Project Identifiers | Project ID: 7826 DEA: 040A1854 EFIS: 0400020652 COOP: 042363 |
|---|---|
| DIST-CO-RTE-PM | 04-SON-101-7.1/8.1 |
| Award Date | 02/12/2013 |
| Closeout Date | 01/03/2017 |
| Work Description | RECONSTRUCT INTERCHANGE |
| Location Description | SONOMA COUNTY IN PETALUMA FROM 0.6 MILE SOUTH TO 0.4 MILE NORTH OF OLD REDWOOD HIGHWAY OVERCROSSING |
| QA Service Level | 1 (Verified on 12/10/2012) |
Sample Information
| Sample Taken Date | 11/15/2013 | Sample Unique Key | 8305233 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 11/18/2013 |
| Sample type | Verification | A brief description of the sample | SCC |
| The quantity of what the sample constitutes | 2 concrete cylinders | From where was the sample collected | Source |
| First name of sampler or witnessed by | Ricardo | Last name of sampler or witnessed by | Medina |
| Title of sampler | QA Inspector | Telephone number of sampler | Not set |
| Laboratory sample identification | Not set | Linked DIME Sample ID | Not set |
| The fabricator/manufacturer/facility name | KieCon | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
| Structure name | Girder G-2 no. 6 | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | K6090-621SCC |
|---|---|---|---|
| The truck number from where the sample was collected | Not set | The batch plant ticket number from where the sample was collected | unknown |
| Concrete batch plant | Not set | The fabricator/manufacturer designation for the sample | Not set |
| A detailed description of where the material sample was collected | By formwork at precast plant | Where the material sample would have been placed if not sampled | Not set |
| From Lot No. | Not set | Bag Lot No. | Not set |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| 2013-11-15-8305233-1 | ASTM C39-10: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens | Stanley Mak, CT HQ - Vallejo Field Laboratory | 11/22/2013 | No | Stopped test when stress is above 9000 psi to avoid machine overload |
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2013-11-15-8305233-1 ASTM C39-10
