Sample Record

DIME Sample ID 2020-06-18-2

Project Information

Project IdentifiersProject ID: 99999
DEA: 0322222
DIST-CO-RTE-PM03-SAC,OMG-888,99,80-0.6-0.6
Award DateNot set
Closeout DateNot set
Work DescriptionTHIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES.
Location DescriptionTHIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES.
QA Service Level (Verified on 04/05/2013)

Owner Lab

  • CT HQ - Sacramento Hot Mix Asphalt Laboratory

Sample Information

Sample Taken Date06/18/2020 Sample Unique Key2
Date that the sample was received by the laboratory/organization performing the testing06/18/2020 Sample typeQuality Control
A brief description of the sampletest The quantity of what the sample constitutestest
From where was the sample collectedSource First name of sampler or witnessed bytest
Last name of sampler or witnessed bytest Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nametest
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-3300-35
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedconveyor
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1/2 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix NumberNot set

JMF Information

HMA Design IDJMF3512-2019-67-Test Date Created01/28/2019
Submittal
Show (8)
JMF3511-208-2019-69 Submittal In Progress
JMF3511-208-2019-71 Submittal Completeness Review Failed
JMF3511-208-2019-72 Submittal Completeness Review Failed
JMF3511-208-2019-113 Submittal In Progress
JMF3511-208-2020-220 Submittal In Progress
JMF3511-208-2021-6 Submittal Accepted for Verification| JMF3513-2021-6
JMF3511-208-2021-8 Submittal Rejected For Use| JMF3513-2021-13
JMF3511-208-2021-16 Submittal Completeness in Review

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments