Sample Record

DIME Sample ID 2020-05-11-1

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 213229
DEA: 050A0504
EFIS: 0500000007
DIST-CO-RTE-PM05-SB-1-15.6
Award Date12/14/2018
Closeout Date08/17/2022
Work DescriptionBRIDGE REPLACEMENT, RETAINING WALL AND FISH PASSAGE.
Location DescriptionSANTA BARBARA COUNTY NEAR LOMPOC AT SALSIPUEDES CREEK BRIDGE
QA Service Level1 (Verified on 03/23/2018)

Owner Lab

  • CT HQ - QASI Sacramento Field Office

Sample Information

Sample Taken Date05/11/2020 Sample Unique Key1
Date that the sample was received by the laboratory/organization performing the testing05/14/2020 Sample typeDepartment Acceptance
A brief description of the sample#5 Bar-Lock Mechanical Couplers The quantity of what the sample constitutes30
From where was the sample collectedFabricator First name of sampler or witnessed byJamie
Last name of sampler or witnessed byDoe Title of samplerQA Inspector
Telephone number of sampler(916) 838-4405 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility namePacific Steel Goup
Transportation Laboratory (TL) NumberC970819 Inspector Lot Number from the Transportation Laboratory (TL) FormS50-022-20
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingAuthorization Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerNucor
Coupler ManufacturerDayton Supior Corp Intermediate Assembler or FabricatorPacific Steel Group
Rebar Size#5 Coupler ModelD250 Bar Lock L-Series Type 2
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop DiameterUnknown Rebar Hoop FabricatorUnknown
Coupler Component Heat/Lot Number(s)heat - MM18108718,A195032 Lot - 179538 Rebar Heat Number(s)3500008748
Rebar Size 2 5 Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2020-05-11-1-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory05/18/202005/18/2020
Yes
05/19/2020Service SplicePublic - Test Data Visible
2020-05-11-1-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory05/18/202005/18/2020
Yes
05/19/2020Service SplicePublic - Test Data Visible
2020-05-11-1-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory05/18/202005/18/2020
Yes
05/19/2020Service SplicePublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2020-05-11-1-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2020-05-11-1-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2020-05-11-1-3 CTM 670-December 2013 (Verified)