Sample Record

DIME Sample ID 2019-10-25-24

Project Information

Project IdentifiersProject ID: 210617
DEA: 042J1004
EFIS: 0414000426
COOP: 042549
DIST-CO-RTE-PM04-NAP-29-11.3/11.6
Award Date02/27/2019
Closeout Date09/28/2021
Work DescriptionCONSTRUCT TWO SEPARATE ROUNDABOUT PROJECTS TOGETHER INTO ONE SINGLE PROJECT AND CONSTRUCTION CONTRACT.
Location DescriptionAT THE INTERSECTIONS OF FIRST STREET/ CALIFORNIA BLVD AND SECOND STREET/CALIFORNIA BLVD (CITY) AND AT HE STATE ROUTE 29 NORTHBOUND ON AND OFF RAMPS AND FIRST STREET ( CALTRANS)
QA Service Level1 (Verified on 08/19/2019)

Owner Lab

  • CT - Unassigned/General Field Laboratory

Sample Information

Sample Taken Date10/25/2019 Sample Unique Key24
Date that the sample was received by the laboratory/organization performing the testing10/25/2019 Sample typePer Request
A brief description of the sampleStructure Backfill The quantity of what the sample constitutes4 Bags
From where was the sample collectedSource First name of sampler or witnessed byIgnacio
Last name of sampler or witnessed byArechiga Title of samplerConsultant
Telephone number of sampler510-207-7252 Laboratory sample identificationNA
Linked DIME Sample IDNA The fabricator/manufacturer/facility nameOC Jones
Transportation Laboratory (TL) NumberNA Inspector Lot Number from the Transportation Laboratory (TL) FormNA
Structure unique identifier28-Napa Structure name29 Roundabout
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleStructure Backfill
The fabricator/manufacturer designation for the sampleWindrow A detailed description of where the material sample was collectedWindrow on site
Where the material sample would have been placed if not sampledfootings and roadway

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments