Sample Record
Owner Lab
- CT D08 - Fontana Southern Regional Laboratory
DIME Sample ID 2019-09-13-6
Sample is locked from editing. info
Project Information
| Project Identifiers | Project ID: 211260 DEA: 072159U4 EFIS: 0715000160 |
|---|---|
| DIST-CO-RTE-PM | 07-LA,ORA-5-0.0/1.5, 44.3/44.4 |
| Award Date | 05/27/2016 |
| Closeout Date | 08/01/2023 |
| Work Description | CONSTRUCT HOV LANES AND MIX FLOW LANES. |
| Location Description | LOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK |
| QA Service Level | 1 (Verified on 03/16/2016) |
Sample Information
| Sample Taken Date | 09/13/2019 | Sample Unique Key | 6 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/16/2019 | Sample type | Quality Assurance |
| A brief description of the sample | 6x12 concrete cylinders | The quantity of what the sample constitutes | 4 |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Antonio |
| Last name of sampler or witnessed by | Picazo | Title of sampler | Field Technician |
| Telephone number of sampler | Laboratory sample identification | 978-301 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | securty paving | |
| Transportation Laboratory (TL) Number | 19091301 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | PIER 3 WALL | |
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | G3-STR-002 |
|---|---|---|---|
| The truck number from where the sample was collected | LOAD 12 | The batch plant ticket number from where the sample was collected | 12 |
| Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | SECURITY PAVING |
| A detailed description of where the material sample was collected | LOAD 12 | Where the material sample would have been placed if not sampled | PIER 3 WALL |
| From Lot No. | Unknown | Bag Lot No. | Unknown |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2019-09-13-6-1 ASTM C39-10 (Verified)
DIME Test ID: 2019-09-13-6-2 ASTM C39-10 (Verified)
