Sample Record
DIME Sample ID 2019-09-13-3
Sample is locked from editing. info
Project Information
| Project Identifiers | Project ID: 213856 DEA: 112888U4 EFIS: 1118000199 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-11,125,905-Various |
| Award Date | 05/09/2019 |
| Closeout Date | 09/14/2023 |
| Work Description | CONSTRUCT FREEWAY TO FREEWAY CONNECTORS AND 4-LANE HIGHWAY FACILITY |
| Location Description | SAN DIEGO COUNTY AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 07/19/2019) |
Owner Lab
- CT HQ - QASI Los Angeles Field Office
Sample Information
| Sample Taken Date | 09/13/2019 | Sample Unique Key | 3 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/14/2019 | Sample type | Quality Assurance |
| A brief description of the sample | #14 HRC 500/510 | The quantity of what the sample constitutes | 8 |
| From where was the sample collected | Source | First name of sampler or witnessed by | Timothy |
| Last name of sampler or witnessed by | Slegers | Title of sampler | D12 METS Rep |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | HRC | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | CMC |
| Coupler Manufacturer | HRC Gerdau | Intermediate Assembler or Fabricator | |
| Rebar Size | 14 | Coupler Model | HRC 500/510 |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | 74113607 62144586 73112054 74112219 | Rebar Heat Number(s) | 033695 |
| Rebar Size 2 | Coupler Unique ID | Not set |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2019-09-13-3-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-09-13-3-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-09-13-3-3 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-09-13-3-4 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-09-13-3-5 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-09-13-3-6 CTM 670-December 2013 (Verified)
