Project Information
| Project Identifiers | Project ID: 213651 DEA: 08388524 EFIS: 0812000124 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-330-32.3/32.6,33.4/33.8 |
| Award Date | 11/28/2018 |
| Closeout Date | 10/23/2020 |
| Work Description | REPLACE BRIDGE RAILS AND APPROACH RAILS. |
| Location Description | SAN BERNARDINO COUNTY FROM 0.2 MILE SOUTH TO 0.1 MILE NORTH OF CITY CREEK BRIDGE AND FROM 0.3 MILE SOUTH TO 0.1 MILE NORTH OF EAST CITY CREEK BRIDGE |
| QA Service Level | 1 (Verified on 02/04/2019) |
Owner Lab
- CT D08 - Fontana Southern Regional Laboratory
Sample Information
| Sample Taken Date | 09/05/2019 | Sample Unique Key | 24 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/06/2019 | Sample type | Quality Assurance |
| A brief description of the sample | 6x12 concrete cylinders | The quantity of what the sample constitutes | 2 |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | soroush |
| Last name of sampler or witnessed by | mavandadi | Title of sampler | ASR |
| Telephone number of sampler | Laboratory sample identification | 998-905 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | ROBERTSONS REDLAND | |
| Transportation Laboratory (TL) Number | 20190905 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | East fork city creek Br, stage 1 | |
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | rrm19036 |
|---|---|---|---|
| The truck number from where the sample was collected | 1746 | The batch plant ticket number from where the sample was collected | 4852349 |
| Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | O DONNELL CONSTRUCTION |
| A detailed description of where the material sample was collected | CHUTE | Where the material sample would have been placed if not sampled | East fork city creek Br stage 1 |
| From Lot No. | Unknown | Bag Lot No. | Unknown |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2019-09-05-24-1 ASTM C39-10 (Verified)