Sample Record
DIME Sample ID 2019-05-29-37
Sample is locked from editing. info
Project Information
| Project Identifiers | Project ID: 213496 DEA: 060U0804 EFIS: 0615000209 |
|---|---|
| DIST-CO-RTE-PM | 06-FRE-5-21.0/31.0 |
| Award Date | 09/26/2018 |
| Closeout Date | 12/04/2019 |
| Work Description | PANEL REPLACEMENT, COLD PLANE, HMA AND RHMA PAVING, AND MGS. |
| Location Description | FRESNO COUNTY ABOUT 14 MILES NORTHWEST OF HURON FROM TUOLUMNE AVENUE OVERCROSSING TO 1.0 MILE NORTH OF ROUTE 5/33 SEPARATION |
| QA Service Level | 1 (Verified on 09/25/2018) |
Owner Lab
- CT HQ - Sacramento Hot Mix Asphalt Laboratory
Sample Information
| Sample Taken Date | 05/29/2019 | Sample Unique Key | 37 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 07/22/2019 | Sample type | Dispute Resolution |
| A brief description of the sample | RAP | The quantity of what the sample constitutes | 1 |
| From where was the sample collected | Source | First name of sampler or witnessed by | Mohammad |
| Last name of sampler or witnessed by | Shirvani | Title of sampler | TE |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Millbrook construction office Granite Construction | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | belt at plant |
|---|---|---|---|
| Aggregate Size | Unknown | Aggregate Source | Unknown |
| RAP Stockpile | Stockpile Size (tons) | Unknown | |
| Reclaimed Asphalt Pavement Mix Number | Not set |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2019-05-29-37-1 AASHTO T164-14 (Verified)
