Sample Record

DIME Sample ID 2019-08-12-1

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 211848
DEA: 112T2174
EFIS: 1116000131
DIST-CO-RTE-PM11-SD-5-R37.4 - R46.5
Award Date12/22/2016
Closeout Date05/01/2026
Work Description(Alternative Delivery) CMGC, San Elijo Highway Bridge Replacement. Replace the San Elijo lagoon highway bridge, construct HOV lanes, construct bike and pedestrian trails and bridge, build multi-use facility at Manchester Ave.
Location DescriptionIN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS FROM 0.1 MILE NORTH OF LOMAS SANTA FE DRIVE OVERCROSSING TO 0.2 MILE SOUTH OF BIRMINGHAM DRIVE OVERCROSSING
QA Service Level1 (Verified on 01/31/2017)

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

Sample Information

Sample Taken Date08/12/2019 Sample Unique Key1
Date that the sample was received by the laboratory/organization performing the testing08/19/2019 Sample typeQuality Assurance
A brief description of the sample#5 Lenton STD A2 The quantity of what the sample constitutesxx
From where was the sample collectedFabricator First name of sampler or witnessed byHitesh
Last name of sampler or witnessed byPatel Title of samplerQuality Assurance Inspector
Telephone number of sampler9168691602 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCMC San Bernardino
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) FormL131-190-19
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC
Coupler ManufacturerErico Lenton Intermediate Assembler or FabricatorUnknown
Rebar Size5 Coupler ModelStandard A2
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop DiameterUnknown Rebar Hoop FabricatorUnknown
Coupler Component Heat/Lot Number(s)L9396 Rebar Heat Number(s)4086989
Rebar Size 2 Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2019-08-12-1-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory08/20/201908/21/2019
Yes
08/21/2019Service Splice - Lot 7Public - Test Data Visible
2019-08-12-1-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory08/20/201908/21/2019
Yes
08/21/2019Service Splice - Lot 8Public - Test Data Visible
2019-08-12-1-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory08/21/201908/21/2019
Yes
08/21/2019Service Splice - Lot 9Public - Test Data Visible
2019-08-12-1-4CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory08/20/201908/21/2019
Yes
08/21/2019Service Splice - Lot 8Public - Test Data Visible
2019-08-12-1-5CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory08/20/201908/21/2019
Yes
08/21/2019Service Splice - Lot 7Public - Test Data Visible
2019-08-12-1-6CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory08/20/201908/21/2019
Yes
08/21/2019Service Splice - Lot 8Public - Test Data Visible
2019-08-12-1-7CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory08/20/201908/21/2019
Yes
08/21/2019Service Splice - Lot 7Public - Test Data Visible
2019-08-12-1-8CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory08/20/201908/21/2019
Yes
08/21/2019Service Splice - Lot 8Public - Test Data Visible
2019-08-12-1-9CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory08/21/201908/21/2019
Yes
08/21/2019Service Splice - Lot 9Public - Test Data Visible
2019-08-12-1-10CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory08/21/201908/21/2019
Yes
08/21/2019Service Splice - Lot 9Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2019-08-12-1-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-08-12-1-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-08-12-1-3 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-08-12-1-4 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-08-12-1-5 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-08-12-1-6 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-08-12-1-7 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-08-12-1-8 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-08-12-1-9 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-08-12-1-10 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-08-12-1-11 CTM 670-December 2013