Sample Record
Owner Lab
- CT D04 - Richmond Field Laboratory
DIME Sample ID 2013-06-25-11356443
Project Information
| Project Identifiers | Project ID: 2114 DEA: 04294914 EFIS: 0400000794 COOP: 2203A3 |
|---|---|
| DIST-CO-RTE-PM | 04-CC,ALA-24-8.2/10.0,0.0/2.7 |
| Award Date | 11/10/2009 |
| Closeout Date | 08/21/2018 |
| Work Description | CONSTRUCT A 4TH CALDECOTT TUNNEL AND BLDG |
| Location Description | In Alameda and Contra Costa Counties from East Temescal separation to 0.8 Km East of Gateway Blvd. |
| QA Service Level | 1 (Verified on 06/28/2012) |
Sample Information
| Sample Taken Date | 06/25/2013 | Sample Unique Key | 11356443 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | Not set |
| Sample type | Department Acceptance | A brief description of the sample | blended aggs |
| The quantity of what the sample constitutes | 3 bags | From where was the sample collected | Source |
| First name of sampler or witnessed by | Billy | Last name of sampler or witnessed by | Bob |
| Title of sampler | TET -Pataluma | Telephone number of sampler | (510) 386-5268 |
| Laboratory sample identification | 999-88-77-66-1 | Linked DIME Sample ID | Not set |
| The fabricator/manufacturer/facility name | SYAR Lake Herman Drum | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
| Structure name | Not set | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-01-0007 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | Syar standard designation -123 | The fabricator/manufacturer designation for the sample | number 4444 |
| The plant number | Syar Concrete - Vallejo | A detailed description of where the material sample was collected | belt an chute |
| Where the material sample would have been placed if not sampled | PCC Pavement north end of Roddy Rod | Primary Aggregate Nominal Size | |
| The concrete mix design number | Lot number | Not set | |
| Sublot number | Not set | Aggregate Mix Number | Not set |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| No results found. | |||||||||
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
