Sample Record
DIME Sample ID 2019-07-30-9
Sample is locked from editing. info
Project Information
| Project Identifiers | Project ID: 212824 DEA: 051C3704 EFIS: 0512000135 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-101-16.4 |
| Award Date | 11/20/2018 |
| Closeout Date | 08/23/2021 |
| Work Description | PISMO CREEK SCOUR REPAIR PROJECT (BR 49-0015K) |
| Location Description | IN SAN LUIS OBISPO COUNTY IN PISMO AT PISMO CREEK BRIDGE |
| QA Service Level | 1 (Verified on 01/29/2019) |
Owner Lab
- CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Information
| Sample Taken Date | 07/30/2019 | Sample Unique Key | 9 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/02/2019 | Sample type | Quality Assurance |
| A brief description of the sample | Ductile Iron Casting | The quantity of what the sample constitutes | 1 |
| From where was the sample collected | Distributor | First name of sampler or witnessed by | Debbie |
| Last name of sampler or witnessed by | Ozuna | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | DSI Dotson Iron | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | SMTL TM6 - Ductile Iron Cast Samples | Heat Number (s) | 2039 |
|---|---|---|---|
| Part Number (s) | 68 19 246 | Material Specification | A536 |
| Grades | 65-45-12 | Metal Foundry Manufacturer (Mill) | Dotson iron casting |
| Prestressing Manufacturer | DSI |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2019-07-30-9-1 ASTM A370-15 (Verified)
